Seminar Presentation
 
 
Presentation "Designing and Managing Patch-cord Management Systems"
Time One or two hours, depending on Conference time and requirements
Subject Patch-Cord Management
Readings Web Study Course - http://www.perfectpatch.com
Graduate Dated Certificate of Completion
BICSI Graduate (of 2-hour course only) will receive 2 credit hours for the BICSI RCDD, Apprentice, Installer, and Technician-level installation registration programs.
Attendees MIS/Telecom managers, installers, trainers, designers, consultants, distributors, manufacturers, reps
Overview Typically in the structured cabling system the patch-cord management is inadequate for network demands. Often described by such terms as "rat's nest," "spaghetti," and "jungle," this management system will increase the time needed to identify and rectify faults, cause additional faults when servicing the system, and reflect poorly on the IT/Telecom staff. "Designing and Managing Patch-cord Management Systems" will bring concrete solutions to rid your facilities of this de facto standard, the "rat's nest" forever. All elements of the management system, such as horizontal management, vertical management, patch panels, rack layout, eliminating patch-cord slack, how to order and reduce patch-cord inventory, training of staff, specifiying a system and much more will be discussed. The attendees may review this subject prior to the presentation at the web study course.
 

The Industry and Patch-Cord Management
Manufacturer's False Portrayal
Industry Perception
Industry Neglected Guidance

Study of Patch-Cord Management
Scope of Study:
Requirements
Sites
System Components
Statistical Accuracy

Horizontal Management Systems Analysis
Types of Management
Space Allocation
Concentrators
Conclusion

Vertical Management Systems Analysis
Types of Management
Space Allocation
Conclusion

Supplemental Mangement Analysis
Types of Management
Field-made Patch Cords
Conclusion


Patch-Cord Analysis
States of a Patch Cord
Measurement Technique
Bend Radius and Patch Cords
Conclusion


Conclusion

Design and Management Methods
 

Terminated Space / Patching Comparison

Open Racks
Types
    Problem Areas
    RMS
    Design


Patch Panels
Types
Problem Areas
RMS
Design

Horizontal Management
Types
Problem Areas
RMS
Design

Vertical Management
Types
Problem Areas
Design


Bend Radius and Patch-cords
Myths
Research

Patch-cord Adjusters
Function
Management
Design

How to Order Patch-cords Lengths

Measuring a Management System for Performance
Management Matrix
Training Personnel

Specifying a Patch-cord Management System

Closing

Home | Design & Installation | Programs | Instructions | Distributors | The Developers | Gallery | Questions | Email Us
PerfectPatch Copyright 2009 by PerfectPatch, Inc. All rights reserved.